Showing posts with label submerged pump. Show all posts
Showing posts with label submerged pump. Show all posts

Friday, August 14, 2009

get ready for installation




hey guys!
so the sub pump is installed, i believe i told you that yesterday, but its now funcional! i went and tested the pumpage and it works well :)



also, i kept working on the bases for the various components. i bulit a holder for the rc reciever

i've laid out the whole interior so i'll start glueing in components tomorrow. after that i have to outfit the decks - install the subdecks, figure out how to secure the main decks, split them up, then put in the connectors and switches. all that is

Thursday, July 30, 2009

basic logic

hey guys. its starting to look like a boat! today i worked on the submerged pump like i talked about yesterday, glueing the cap and piping to the pump, simulating the installation on a piece of plastic so i didn't put a bad hole in the hull. its going to work nicely :)

i'm planning out the interior organization, finding where everything goes. picked up a PC circuit board housing that will work nicely as the radiobox because the tupperware i stole from my mom actually isn't desirable. (funny side note. i just realized the stealth theivery wasn't very secretive. my mom is reading the blog. so i tipped her off to my crime. oh well. i'm returning the tupperware so all ends well).

i'm also working on the circuitry for the pump. it turns out the fill switch is on when i want it to be off and off when i need it to be on. sucks. but i went to my dad and he suggested i use a SPDT (single pole double throw) relay. [big words present to impress] basically, what i've been assure it'll do is switch the switch so that it turns on when i want on and off when i want off. i just have to make it do that still. i've been sitting on the floor of the garage playing with the ohmmeter and alligator clips and it feels like physics lab all over again. except this time i have to make it work without D. Lawrence explaining things for an hour until i'm so bored i stop trying to understand and just brainlessly do e.x.a.c.t.l.y. w.h.a.t. h.e. s.a.y.s. without it actually making sense. this way is a lot more fun than that. its all logic switches and such (hence the title)

still waiting on the damn motor mount to come in. i'm going to be PISSED if it doesn't come in tomorrow. basically i'm hosed if it doesn't. no way around it.

oh, and i just learned one of the band members has offered me use of his machine shop and any material i might need from it. (CRAZY GOOGELY EYES AND MOUTH GAPING OPEN IN EXCITEMENT/DISBELIEF!) if only i had known about it sooner!

i'll post pictures later tonight after i'm done with stuff

Wednesday, July 29, 2009

all the little pieces

been doing lots of the little things still. the fill switch is in place, needs to be tested but its in. the battleswitch is all set to go, and it has been tested. my dad and i worked on the submerged pump fitting so that it keeps the hull dry, and that should work. this new plan is a little bit more complicated than the one i had yesterday, but its more practical. i'll work on that tomorrow. the motor mount should come in tomorrow, install those pieces on friday i suppose. i gotta look into the foam flotation inserts too. o and i learned the battery i have is not water suitable, so its 50/50 whether i use it in a waterproof box or go elsewhere. gotta look into that.

*update* here are some pictures that took along the way


Tuesday, July 28, 2009

component fitting

still waiting on the second motor mount so i'm not ready to epoxy anything in yet. however, i'm fitting all the pieces with wood blocks and other plates so I can fix them on the hull. had to come up with a method to make the secondary pump sit SUBMERGED in water inside the hull while the rest of the inside is free of the H2O. tricky business. so theres that project, then i have to make the fill switch work in the tank to control the secondary pump. bit of a snag in the project, but not worth describing in too much detail. i just have to make the connections waterproof without much room to maneuver because its all on the inside of the tank. basically like the boat in a bottle project. then i work on the connections between pumps and tank. after that, i can hook it up to the wiring i've prepared and the pump/gun system is ready to go. after that i'll just be working on installation.

i'm gonna go back to it!