Wednesday, July 29, 2009

all the little pieces

been doing lots of the little things still. the fill switch is in place, needs to be tested but its in. the battleswitch is all set to go, and it has been tested. my dad and i worked on the submerged pump fitting so that it keeps the hull dry, and that should work. this new plan is a little bit more complicated than the one i had yesterday, but its more practical. i'll work on that tomorrow. the motor mount should come in tomorrow, install those pieces on friday i suppose. i gotta look into the foam flotation inserts too. o and i learned the battery i have is not water suitable, so its 50/50 whether i use it in a waterproof box or go elsewhere. gotta look into that.

*update* here are some pictures that took along the way